The Dauphin Island Sea Lab is Alabama’s primary marine education and research centre and is the home site of the Marine Environmental Sciences Consortium.The Sea Lab put out a public bid to renovate its cafeteria and restrooms inside Beagle Hall, including the floors. After submitting a bid, General Contractor DCD Construction, Inc., and Decorative Concrete Designs was awarded the project.
The Dauphin Island renovation project scope
included the cafeteria’s entire interior: adding two bathrooms; adding four new
showers; and renovating four existing restrooms with new floors, fixtures,
partitions, and walls at the Beagle Hall Dormitory. Total floor renovation was approximately
400m2.
The DCD coatings team applied a white and a custom
blend of white and bright green SPARTACOTE® pigmented base coats to the
prepared underlayment surface. They then broadcast the custom colour flake, and
then applied SPARTACOTE® PURE top coats to the surface, giving the floor a
smooth, easy to clean finish.
The
owner, Dauphin Island Sea Lab, is very happy with their new SPARTACOTE floor,
its aesthetics, its safe, high traction properties, and its easy maintenance. Click here to read the full story.