Tuesday 8 March 2016

New Floors for Dauphin Island Sea Lab



The Dauphin Island Sea Lab is Alabama’s primary marine education and research centre and is the home site of the Marine Environmental Sciences Consortium.The Sea Lab put out a public bid to renovate its cafeteria and restrooms inside Beagle Hall, including the floors. After submitting a bid, General Contractor DCD Construction, Inc., and Decorative Concrete Designs was awarded the project.
The Dauphin Island renovation project scope included the cafeteria’s entire interior: adding two bathrooms; adding four new showers; and renovating four existing restrooms with new floors, fixtures, partitions, and walls at the Beagle Hall Dormitory. Total floor renovation was approximately 400m2.

The DCD coatings team applied a white and a custom blend of white and bright green SPARTACOTE® pigmented base coats to the prepared underlayment surface. They then broadcast the custom colour flake, and then applied SPARTACOTE® PURE top coats to the surface, giving the floor a smooth, easy to clean finish.

The owner, Dauphin Island Sea Lab, is very happy with their new SPARTACOTE floor, its aesthetics, its safe, high traction properties, and its easy maintenance. Click here to read the full story.
Got a concrete flooring project in mind? 

Contact us to discuss your next project - Call 1800 331 012 or email us here.

1 comment: